| Sr No |
Year |
Project |
Project Description |
Location |
Customer |
| 1 |
2008 |
ROLLER HEARTH |
Fabrication, Erection,
Alignment of complete 140
Rollers & Commissioning of
Roller Hearth Furnace
(Tonnage 90 tons).
|
ISMT, LTD.
Baramati
Maharastra |
SecoWarwick
Allied Pvt.
Ltd.
|
| 2 |
2008 |
H & T LINE |
Fabrication, Erection, Alignment of Coiler, De Goiter Commissioning of the complete Hardening
Tempering Furnace |
Bhushan
Steel
Khharas, opoli
|
SecoWarwick
Allied Pvt.
Ltd.
|
| 3 |
2008 |
TURNKEY
PROJECT
|
Fabrication, Erection and
commissioning of 100 TPD
Edible Oil Refinery
|
KTV Oil
Tuticorin
Tamil
Tamil nadu
|
Glamptech
Agro Process
Pvt. Ltd
|
| 4 |
2008 |
EQUIPMENT
ERECTION
|
Complete Fabrication Erection
and Commissioning of Argon
Gas Purifiers for their Argon
Gas Plant for Laser & Plasma
Technology Division.
|
BARC,
Anushakti
Nagar,
Maharastra |
BARC |
| 5 |
2009 |
VENTURI
SCRUBBER
|
Fabrication,Erection and
Assembly of it parts in the
steel Plant.
|
Essay Steel
Ltd.
Hazira
Gujarat
|
L & T Ltd. |
| 6 |
2009 |
PIPING WORK |
5 Kilometer Steam Tracing of
Hydro Carbon Pipe Line in
Coker 6 Drum.
|
RPL,
Jamnagar,
Gujarat
|
REAL. |
| 7 |
2009 |
REVAMPING
OF COLUMN
|
42 Trays were changed from
the Column in Ammonia
Plant.
|
RCF,
Mahul
Maharastra
|
Kotch Glitch
pvt. ltd.
|
| 8 |
2009 |
PIPING WORK |
2.5 Kilometer Steam Tracing of
Hydro Carbon Pipe Line in
Coker 2 Drum.
|
RPL,
Jamnagar,
Gujarat
|
REAL. |
| 9 |
2009 |
PIPING WORK |
Changing of Existing Lpg Gas Pipe Line to LNG Gas Pipe Line For 6 Nos Gas Fired Furnaces
|
Bhushan
Steel,
Khopoli,
Maharastra
|
Bhushan
Steel
|
| 10 |
2009 |
PIPING WORK |
1.2 Kilometer Steam Tracing of Hydro Carbon Pipe Line in L Rack.
|
RPL,
Jamnagar,
Gujarat
|
REAL. |
| 11 |
2009 |
STRUCTURAL WORK
|
Fabrication, Erection and commissioning of Boogie Hearth Furnace (Tonnage 200 Tons)
|
L & T Ltd. |
Secowarwick
Allied Pvt.
Ltd. |
| 12 |
2009 |
PIPING WORK |
Punch Point Clearing of Hydro carbon Line in Alkalisation Plant.
|
RPL,
Jamnagar,
Gujarat
|
REAL. |
| 13 |
2009 |
Bharati Ship
Yard
|
Fabrication of Piping Spool for Bharati Ship buildings.
|
Ratnagiri
India
|
Bharati Ship
Yard
|
| 14 |
2009 |
PIPING WORK |
Fire Water And Foam Line Replacement for the Crude Tank No 811-005 in the Marine Tank Farm.
|
RIL,
Jamnagar,
Gujarat
|
RIL |
| 15 |
2009 |
PIPING WORK |
Fire Water And Foam Line
Replacement for the Naphta
Tank No 813-020 in the Marine
Tank Farm.
|
RIL,
Jamnagar,
Gujarat
|
RIL |
| 16 |
2009 |
SHUTDOWN
PROJECT
|
Replacement of complete CBA
42" Pipe line and 12 " SS 316
Line in Sulphur Plant.
|
RIL,
Jamnagar,
Gujarat |
RIL |